Developer electrical services Aruba

Electrical for Developers & Builders

From permit drawings to ELMAR handover — full electrical for new construction in Aruba

Ground-Up Electrical. First Attempt Pass.

Construction delays cost money. Inspection failures cost more. BES manages the electrical scope for new builds from initial permit drawings through to ELMAR connection and final NEN 1010 sign-off — coordinating directly with your project manager to stay on schedule.

We work on villas, commercial fit-outs, mixed-use developments, and resort projects. Our design capability means we're not just installers — we're a technical partner from the start of the project.

Electrical drawings for permits ELMAR inspection coordination First-attempt NEN 1010 pass On-schedule delivery
New construction electrical Aruba

Full-Scope Electrical for New Builds

Electrical Design & Drawings

Permit-ready electrical drawings covering load calculations, circuit layouts, panel schedules, and earthing. Designed to NEN 1010 from the start.

Full Installation

Complete wiring, conduit, panels, fixtures, and outdoor circuits. Phased installation to match construction milestones.

ELMAR Coordination

Direct coordination with ELMAR for metering, grid connection, and inspection scheduling. We handle the paperwork and the liaison.

Solar & EV Pre-wiring

Install conduit and panel capacity during construction for future solar and EV charging without costly retrofitting later.

Outdoor & Pool Circuits

Weatherproof outdoor wiring, garden lighting, pool pump circuits, and terrace power. All GFCI protected per NEN 1010.

Inspection & Handover

Manage the full inspection process. Provide as-built drawings and compliance certificates for project handover documentation.

How We Work on New Construction

01

Design & Drawings

We review your architectural plans and produce electrical drawings for permit submission, including load calculations and panel schedule.

02

Rough-In Installation

Conduit, boxes, and rough wiring installed during structural phase. Coordinated with your construction schedule.

03

Final Installation

Panels, fixtures, outlets, switches, and final connections. Full testing and load balancing before inspection.

04

ELMAR & Inspection

We coordinate ELMAR connection and manage the NEN 1010 inspection. Provide all documentation for project handover.

Building in Aruba?

Share your project plans and we'll send a technical proposal with timeline and scope.

Chat on WhatsApp