From permit drawings to ELMAR handover — full electrical for new construction in Aruba
Construction delays cost money. Inspection failures cost more. BES manages the electrical scope for new builds from initial permit drawings through to ELMAR connection and final NEN 1010 sign-off — coordinating directly with your project manager to stay on schedule.
We work on villas, commercial fit-outs, mixed-use developments, and resort projects. Our design capability means we're not just installers — we're a technical partner from the start of the project.
Permit-ready electrical drawings covering load calculations, circuit layouts, panel schedules, and earthing. Designed to NEN 1010 from the start.
Complete wiring, conduit, panels, fixtures, and outdoor circuits. Phased installation to match construction milestones.
Direct coordination with ELMAR for metering, grid connection, and inspection scheduling. We handle the paperwork and the liaison.
Install conduit and panel capacity during construction for future solar and EV charging without costly retrofitting later.
Weatherproof outdoor wiring, garden lighting, pool pump circuits, and terrace power. All GFCI protected per NEN 1010.
Manage the full inspection process. Provide as-built drawings and compliance certificates for project handover documentation.
We review your architectural plans and produce electrical drawings for permit submission, including load calculations and panel schedule.
Conduit, boxes, and rough wiring installed during structural phase. Coordinated with your construction schedule.
Panels, fixtures, outlets, switches, and final connections. Full testing and load balancing before inspection.
We coordinate ELMAR connection and manage the NEN 1010 inspection. Provide all documentation for project handover.